Introduction:
The intimate Viladům Dalejský potok project by Stempel & Tesar architectural studio offers only seven brand new, top quality apartments with terraces and private garages; located in the immediate vicinity of the Prokopské údolí valley. Benefitting from its location in a quiet area of Hlubočepy, Prague, this modern residence is directly linked to the beautiful forested valley surroundings.
Apartments:
The project features units with layouts of 1-bedroom to 5-bedroom, including a ground floor apartment with a private garden and two superior-sized duplex flats, with areas from 39 to 216 m2. Each apartment boasts a pleasant green views.
Quality equipment to include a smart home system that allows direct control of heating, lighting and other facilities via mobile phone, tablet or computer, three-layer wooden floors with underfloor heating throughout except for the bedroom, Italian tiles, aluminum windows with triple glazing, Laufen, Riho, SanSwiss or Kludi bathroom fittings; heating provided by a condensing gas boiler. The purchase price of almost each apartment includes up to 2 parking spaces in an enclosed private garage with a large storage space, heated driveway and automatic gate with remote control.
Location:
Pleasant, green location with easy access downtown, just 10 minutes from Smíchovské nádraží metro and train station and 15 minutes from the city center. Nursery and primary school, playground, restaurants, and bus stop just a few minutes' walk from the apartment.
Completion scheduled for May 2016.
August 2015: Private underground garage complete and ground floor nearing completion.
October 2015: Construction of the 3rd floor.
November 2015: The building structure is complete, and work on the roof is currently in progress. Work on the facade is set to commence during the second week of November, while all windows will be installed by November 18th.
February 2016: roof is complete, facade almost finished, work on wiring and distribution system in progress.
March 2016: Wiring, ventilation, water and drainage pipes are 50% finished. Work on the heating system and driveway is underway.
Please contact us any time if you have any questions and our team will get back to you.